Accessibility tools

HS2: Unit rate calculator

Posted by 4MAT Administrator
Posting date:7/29/2019 9:27 AM
HS2 commissioned the DAM team to develop a tool that supported analysis of the whole Life Cycle Cost of HS2. The tool was used in comparing early design phase options for various asset types, including structures. The DAM team developed a scenario-builder that incorporated initial construction cost and future Operations and Maintenance (O&M) costs, such as inspection, maintenance and replacement of components.

Creating the tool required the team to utilise their engineering judgement and experience to produce indicative direct works costs. Consultation with the corresponding HS2 technical leads ensured that the correct interventions were being modelled to meet their needs.

jobscarousel

Related Jobs

We are sorry but we currently have no jobs in this area.


Continue browsing to look at our other available opportunities

Related Articles

Engineering into the future

How this graduate is challenging the world of transport.

Structures toolkit

Asset management competency framework

Recently Viewed Jobs

Navigation